List of Large-Scale Tests
System Test
Construction of the system test for Seismic Testing
|
Phase 1: Horizontal Seismic Testing of the system unit in the Longitudinal Direction
|
Phase 2: Vertical Load Connection Testing of the system unit
|
Connection Test Unit 1 : GUSC and LUSC Connections
First Unit with GUSC and LUSC connection
|
GUSC +3.75, -7.5 inches Displacement
|
GUSC - View of the connection region
|
LUSC +6, -12 inches of Displacement
|
LUSC - Overall view
|
LUSC - View of the connection region
|
Connection Test Unit 2 : ESBF and ESSP Connections
ESBF connection - View from End of Girder
|
ESBF - the connection region
|
ESBF - View from the bottom of cap beam to girder interface region
|
ESSP - overall view
|
ESSP View of the Connection Region
|
ESSP view from the bottom of cap beam to girder interface region
|
Connection Test Unit 3 : ESLS and ESMS Connections
ABC - Connection Test - Third Unit with ESLS and ESMS
|
ESLS Girder-to-cap Connection Test - Overall View
|
ESLS Girder-to-cap Connection Test - View of the Connection Region
|
ESLS Girder-to-cap Connection Test - A view from the bottom of connection
|
ESMS Girder-to-cap Connection Test - Overall View
|
ESMS Girder-to-cap Connection Test - Connection Region
|
ESMS Girder-to-cap Connection Test - View from the bottom of connection
|
|