Accelerated Bridge Construction (ABC) - Substructure
CONNECTION DETAIL
COMPONENTS CONNECTED
DESCRIPTION
Grout Duct
UTILIZING
ADDITIONAL INFORMATION
DESIGN RECOMENDATIONS
ADVANTAGES CHALLENGE
• No formwork is required in field. • Inappropriate duct grouting would reduce the performance of connection.
• Both column and bent cap can be precast and sufficiently connected. • Extended column bars require small tolerance to fit duct in precast bent cap.
SCORE
Structural performance 5/5 (0 have significant issue, 5 same/better when compared to conventional CIP method)
Constructability 3/5 (0 difficult, 5 easily)
Speed of construction 3/5 (0 very slow, 5 very fast)
Cost 5/5 (0 very expensive, 5 cost effective when compared to conventional CIP method)